delta_cross_channel_closed.Rd
The number of days and proportion of days the Delta Cross Channel gates are typically closed for each month. The components of the list contain output from four different Calsim runs:
biop_2008_2009: output from the 2008-2009 Calsim II BiOp run.
biop_itp_2018_2019: output from the 2018-2019 Calsim II BiOp run.
calsim_run_of_river: output from the Calsim Run of River run.
LTO-12a: output from the LTO-12a Calsim III run.
delta_cross_channel_closed
a named list where each element is a 2 by 12 matrix, row one and two are the count and proportion of days closed respectively, columns are months
By rule, 45 days between November-January, based on real time monitoring. For modeling purposes, the days closed where divided between December and January.
Note: Some real-time changes possible based on:
fish monitoring
interior delta salinity
flood operations
In May, typically open for Memorial Day.